• The concrete structure of the MICX congress hall in Mons Belgium was achieved in 8 months only by using 3DR® (vs 24 months planned)
.
• Between timing and materials, the cost savings is estimated to be around 46 % of budget.
• We received the Belgium Industrial Award for this achievement.